摘要
介绍了2006年首钢迁钢公司1号高炉实现焦比300kg/t以下所采取的加强对原燃料的质量控制及改进炉内操作等主要措施,为首钢大高炉建设提供技术准备、积累管理经验。
In this paper, the key measure carried out by Shougang Qian' an Iron & Steel Co., Ltd., in enhancing the quality control of fuel and burden material and improving the operation inside BF as the coke ratio under 300 kg/t at NO. 1 blast furnace, is introduced. This provides Shougang valuable management experience in BF construction and technology support.
出处
《首钢科技》
2007年第5期31-34,共4页
Shougang Science and Technology
关键词
高炉
精料
焦比
blast furnace, beneficiated burden material, coke ratio