水利水电工程施工招标标底是招标人对工程投资的预测价格,是选择中标人的重要参考依据。编制标底需注意研究评标办法,确定施工组织设计、研究工程单价,多方面分析标底合理性等。
The base bid price for water conservancy and hydropower projects is the estimated project investment by the owner and is the basis for choosing the bidder to be awarded as well. The preparation of the base bid prices should pay more attention to the methods of bid evaluation, construction organization plan, unit prices of the works, the rationality of base bid price and etc.
出处
《北京水务》
2007年第5期58-60,共3页
Beijing Water
关键词
水利水电工程
编制
评标办法
Water conservancy and hydropower projects Preparation Bid evaluation method