摘要
我国低水头水力资源十分丰富,近年来灯泡贯流式机组发展迅速,正在向大容量、高水头、大尺寸方向发展,十分可喜,但也看到一些灯泡贯流式机组事故频繁,暴露出来的问题较多,应该引起足够重视,作者结合若干机组事故实例,探讨经验教训和提出几点粗浅建议。
With abundant water power resources in China,the development of bulb tubular units is rapid in recent years and it tends to large capacity,high water head and big dimensions.On the other hand,it is notable to the frequency of accidents and the revealed problems.The author probes into experience and les- sons on the basis of the accident examples and puts forward some proposals.
出处
《水电站机电技术》
2007年第5期8-12,共5页
Mechanical & Electrical Technique of Hydropower Station
关键词
灯泡贯流式机组
设计
制造
安装
运行
建议
bulb tubular unit
design
manufacture
installation
running
proposal