摘要
芜湖开发区垃圾焚烧热电厂是迄今为止安徽省唯一一座垃圾发电厂。该项目获2005年度安徽省优秀工程设计一等奖,其设备全部国产化,设计中提出了一条崭新的、行之有效的设计思路,不仅解决了垃圾处理、输送、焚烧系统等主要设计难点,还在实现垃圾减量化的同时有效地避免了二次污染。取得了良好的环境、社会、经济效益,成功地摸索出一条适合国情、省情的垃圾处理方式。
Municipal solid waste incineration co-generation power plant in Wuhu economic & technic development zone is the only municipal waste incineration co-generation power plant in Anhui province up to now. This Project won the first grade prize for the excellent design of Anhui province in 2005. The equipments were all made in china. The design put forward a new and effective thinking way, not only solved the main difficulties in solid waste treat- ment, transportation and incineration system but also avoided the once more pollution and reduced the waste volume at the same time. The project has gained a fine benefit in environment, society and economy , fished out a success- ful way in treating municipal solid waste adapt to the country and the province situation.
出处
《电力勘测设计》
2007年第1期39-42,共4页
Electric Power Survey & Design
关键词
垃圾
焚烧
发电
waste
incineration
generation electricity