1Patterson J.H,Slowinski R,Talbot F.B,WeglarzJ.An algorithmfor a generalclass ofprecedence and resource constrained schedulingproblems[]..
2Sprecher A.Resource constrained project scheduling:Exact methods for themulti-mode case[].Lecture Notes in Economics and MathematicalSystem.1994
3Kelly J.E.The Critical path method:Resources planning and scheduling[].Industrial scheduling.
4Herroelen W,Demeulemeester E.Aclassification scheme for project schedul-ing problems Handbook on recent advances in project scheduling[].J Weglarz.1998
5Kolisch R,Hartmann S.Heuristic algorithms for the resource-constrainedproject scheduling problem:Classification and Computational Analysis in:ProjectScheduling:Recent Models,Algorithms and Application[].J Weglarz.1998