摘要
本文讨论了机器随机故障时,使拖后工件数最少的单机调度问题.结果表明,确定情况下的Moore-Hodgson算法,在机器随机故障时,能以概率1确定最优工件排序.
n this paper, a scheduling problem for minimizing the number.of tardy jobs on a single machine which is subject to stochastic breakdowns is discussed. The result shows thatMoors--Hodgson algorithm can also determine the optimal sequence of the scheduling problem with probability I when the machine is subject to stochastic breakdowns.
出处
《南开大学学报(自然科学版)》
CAS
CSCD
北大核心
1997年第2期9-13,共5页
Acta Scientiarum Naturalium Universitatis Nankaiensis
基金
国家自然科学基金
国家"863"高技术自动化领域CIMS主题项目资助
关键词
单机调度
随机故障
拖后工件数
调度
排序
single machine scheduling
stochastic breakdown
the number of tardy jobs