期刊文献+

北京某地铁站改造工程土方和护坡施工方案 被引量:1

The earthwork and slope protection construction program of one underground reform projects in Peking
下载PDF
导出
摘要 结合工程概况与地质水文条件,从工程施工管理措施与管理目标、土方与护坡工程的施工管理、工程监测施工等方面介绍了北京某地铁改造工程的施工方案,并对基坑支护的风险评估及可能出现紧急情况的处理措施进行了分析,从而为类似桩基工程提供了技术参考和可借鉴的经验。 Combined with the projects general situation and geologic hydrographic condition, from the projects construction management steps and the targets, the construction management of earthwork and slope protection and projects detecting construction it introduces the construction program of one underground reform projects in Peking, and analyses the adventure appraisal of foundation ditch support and the management steps of the urgent situation that may be happen. This gives the technique reference and the experiences that can be referred to the simi- lar pile foundation projects.
作者 赵铁民
出处 《山西建筑》 2007年第32期112-113,共2页 Shanxi Architecture
关键词 土钉墙支护 护坡桩 施工管理 工程监测 nailed wall support, slope protection pile, construction management, project detect
  • 相关文献

参考文献2

共引文献3

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部