摘要
对一个FIDIC合同条件下的国际工程索赔案例进行了介绍和分析,提出了国际工程项目索赔的方法和要点,指出承包商要充分利用合同条款来保护自己的利益,认真把握索赔的机会,策略性地开展索赔工作,以便实现国际工程承包的二次盈利。
One claim case of international engineering project under conditions of FIDIC contract text is introduced and analyzed, at the same time practical method as well as key points is proposed for claim, Author points out contractors should make full use of contract articles to protect their benefits, seize serious the fight time of claim, and carry out claim work strategically to gain secondary profits of international engineefing project.
出处
《山西建筑》
2007年第32期257-258,共2页
Shanxi Architecture
关键词
国际工程
索赔
承包商
公路
进度计划
international engineering project, claim, contractor, highway, schedule plan