普定碾压混凝土拱坝是我国首座碾压混凝土拱坝,于1993年年底开始蓄水,至今已正常运行14年,经受了多次洪水考验。本文重点介绍了该坝设计特点、质量检查基本情况及该坝建成后的运行管理情况。
Puding is the first RCC arch dam built in China, which started storing water at the end of 1993. It has been operated for 14 year till now and experienced the test of flooding. The paper introduces the feature of dam design, quality condition and operation and maintenance of the dam.
出处
《中国水利》
2007年第21期35-37,共3页
China Water Resources
关键词
普定
碾压混凝土拱坝
运行管理
Puding
RCC arch dam
operation and maintenance