摘要
介绍柬埔寨王国基里隆一级水电站辅助设备初步设计会审情况,对国内外水电工程机电设备供货管理有一定借鉴作用。
The joint checkup procedure on preliminary design of hydropower plant auxiliary equipment in Jililong Cambodia kingdom was introduced.It is usable for referenceal for mechanic and electrical equipment supply management of hydropower project at home and abroad.
出处
《湖北电力》
2007年第5期70-70,共1页
Hubei Electric Power
关键词
机电设备
优化设计
水电站
mechanical and electrical equipment
optimizing design
hydropower plant