期刊文献+

秦皇岛港煤五期翻车机房工程综合抗渗防裂技术 被引量:2

Techique of Anti-Permeability and Anti-Crack for the Project of Wagon Tipping Room of Fifth Phase of Coal Terminal of Qinhuangdao Port
下载PDF
导出
摘要 针对秦皇岛港煤五期翻车机房工程,通过若干项新技术应用、技术改进,控制关键环节,对大体积超长混凝土结构采取了切实可行的抗渗防裂措施。施工后经过2年的观察证明,没有发现有害裂缝发生,基本达到不渗不漏。 To the project of wagon tipping room of fifth phase of coal terminal of Qinhuangdao Port, it has demonstrated the construction quality of project is very good and there is no harmful cracks in its' concrete structures through 2 years observation, due to the application of some new techniques, technical modification, control key links and taking practical measures of anti-seepage and anti-crack for mass and over length concrete. It can be said that the requirements of no leakage of concrete structures are basically achieved.
出处 《中国港湾建设》 北大核心 2007年第5期54-57,共4页 China Harbour Engineering
关键词 翻车机房 大体积混凝土 新技术 抗渗防裂 工期 质量 wagon tipping room mass concrete new technique anti seepage and anti-crack construction period quality
  • 相关文献

同被引文献4

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部