超长引桥工程的几项关键施工技术

Several Key Construction Techniques for Super Long Approach Bridge Works
下载PDF
导出
摘要 通过对东营港扩建引桥工程的设计特点、施工难点的分析,制定了大管桩与钢管组合斜桩沉设、挡冰桩裙安装、承台现浇和50 mT型梁海上安装等几项关键施工技术方案,并得到成功应用。为今后我国外海,特别是北方海域利用大管桩作基础的跨海桥梁、高桩码头等工程的设计与施工提供一定的借鉴。 Through the analysis of design characteristics and construction difficulties of the approach bridge works for expansion of Dongying Port, a proposal of several key construction techniques for the sinking in form of combination of large pipe pile and batter pile composed of steel pipes, the installation of pile skirts for ice blocking, the cast-in-situ concrete of base slab and the installation of 50 m T-beam on sea, etc. is worked out and successfully applied. And some experiences are provided for the design and construction of bridge crossing over sea and high pile wharf taking large pipe pile as foundation in the outer sea and especially in the northern sea area of China.
出处 《中国港湾建设》 北大核心 2007年第5期68-73,共6页 China Harbour Engineering
关键词 东营港 组合桩 组合套箱 50MT梁 施工技术 Dongying Port composite pile composite shell type boxes 50 m T-beam construction technique
  • 相关文献

参考文献3

  • 1JTJ/T261-97,港口工程预应力混凝土大直径管桩设计与施工规程[S].
  • 2JTJ041-2000.公路桥涵施工技术规范[S].[S].,..
  • 3GB50017-2003.钢结构设计规范[S].[S].,..

共引文献3730

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部