翻车机房与廊道地下混凝土结构抗裂防渗技术的改进 被引量:1

Modification of the Technique of Anti-Crack and Anti-Leakage for Underground Concrete Structures of Wagon Tipping Room and Gallery
下载PDF
导出
摘要 简述了翻车机房及廊道地下构筑物施工中常用的混凝土抗裂防渗施工技术措施,分析了以往翻车机房及廊道工程中出现的主要裂缝及抗渗点,通过比较分析后提出了京唐港翻车机房与廊道工程采取的抗裂防渗技术措施,为以后类似工程提供借鉴。 The paper describes common used techniques of anti-crack and anti-leakage of concrete in the construction of underground structures of wagon tipping room and gallery, analyzes main cracks and impervious points formerly appeared in the construction of wagon tipping room and gallery, puts forward the measures of adopting anticracks and anti-leakage techniques in the project of wagon tipping room and gallery of Jingtang Port through comparison and analysis in order to reference in similar works future.
作者 张立明
出处 《中国港湾建设》 北大核心 2007年第5期74-76,82,共4页 China Harbour Engineering
关键词 地下构筑物工程 翻车机房及廊道 混凝土抗裂防渗 施工 措施 underground structure wagon tipping room and gallery anti-crack and anti-leakage of concrete construction measures
  • 相关文献

参考文献1

  • 1GB50164,混凝土质量控制标准[S].

共引文献4

同被引文献7

引证文献1

二级引证文献1