摘要 为了探讨利用人造洪水冲刷黄河内蒙古河段泥沙的可能性,建立了计算黄河三湖河口与头道拐站次洪水输沙量非线性模型。通过洪水计算获得了该河段各级洪水冲刷河道泥沙的最大冲沙量、最优冲沙历时以及相应冲沙效率。计算结果表明:黄河宁蒙段的淤积是河流在特殊的自然地理环境中受水流堆积作用形成的,用龙、刘两库联合调度水量形成的人造洪水冲刷河道淤积泥沙是目前可以采取的清淤手段之一,但耗水量较大,冲刷效果还有待于进一步的检验。  In order to discuss the possibility of washing out channel deposits in Inner Mongolia reach of Yellow River by means of man-made flood,a nonlinear model used for calculating silt discharge is established.By the model the maximal sediment discharge,the optimal scoring time and the corresponding washing-out efficiency under different flood levels are obtained.The results show that the sediments in Inner Mongolia reach of the Yellow River are formed in particular water flowing and depositing environment;one of the available methods for scouring channel deposits at present is using the artificial flood made by synthetically operating the Longyangxia Reservoir and the Liujiaxia Reservoir.But the scouring effect needs further test due to large water consumption.
出处 《中国沙漠》 CSCD 北大核心 2007年第6期1085-1089,共5页 Journal of Desert Research
基金 2005年甘肃省黄河黑山峡 小观音水利枢纽工程领导小组办公室资助
关键词 调度洪水 冲刷泥沙 黄河内蒙古河段 flood operation scouring sediment Inner Mongolia reach of the Yellow River
  • 相关文献

参考文献10

二级参考文献52

共引文献294

同被引文献156

引证文献13

二级引证文献94

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部