期刊文献+

济钢3~#1750m^3高炉中修开炉快速达产实践 被引量:2

Practice of Blow-in and Fast Reaching Designed Capacity after Intermediate Reline of Jinan Steel's No.3 1 750 m^3 BF
下载PDF
导出
摘要 济钢3#1 750 m3高炉冷却壁水管损坏,2007年3月停炉中修,清除残余焦炭100 t,更换了风口区冷却壁。由于开炉准备充分,配料计算精确、装料制度合理、操作参数选取得当,高炉开炉2 d即喷煤,第3 d利用系数即达到2.48 t/(m3.d),实现了开炉后3个月休风率为零。 Due to the breakage of water pipe of cooling stave, Jinan Steel's No.3 1750 m^3 blast furnace blowing down for intermediate reline. 100 tons remaining coke were eliminated and the cooling staves in tuyere zone were replaced in March, 2007. Because of prepare full, accurate calculation for proportioning, reasonable charging system and appreciate operation parameters selected, pulverized coal injection was resumed on the second day after blow-in and the productivity reached 2.48 t/ (m^3·d) on the third day and downtime percentage reached zero in three months after blow-in.
出处 《山东冶金》 CAS 2007年第5期29-31,共3页 Shandong Metallurgy
关键词 高炉 冷却壁 中修 开炉 达产 blast furnace cooling stave intermediate reline blow in reaching designed capacity
  • 相关文献

同被引文献4

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部