期刊文献+

节点与测量数据组合检测的数据协调及应用 被引量:2

Data reconciliation method containing nodal and measurement test and its application
下载PDF
导出
摘要 提出一种新型的节点与测量数据组合检测的稳态数据协调方法。该方法通过节点检测法和测量检测法共同检测可能存在显著误差的可疑节点,以及与可疑节点相连的最可疑测量变量,并通过调整量检测法融合领域专家的先验知识判断最可疑测量变量是否存在显著误差,最终实现稳态数据协调和显著误差同步检测。该组合方法融合测量检测和节点检测方法的各自优点且克服各自的缺点。仿真研究与实际应用表明,该组合方法对有多个显著误差的系统也能给出准确的显著误差检测结果,且优于迭代测量检测方法。 A novel combined method based upon nodal test and measurement test (NT-MT) was proposed for gross error detection and steady-state data reconciliation. In NT-MT, nodal test and measurement test were used together to find the suspicious nodes with gross error and to further find the most suspicious measurement variable connected to one of the found suspicious nodes. Then, adjustment test, which was able to consider the known knowledge obtained by expert, was introduced to determine whether the most suspicious measurement variable had gross error or not. This method took advantage of both nodal test and measurement test and overcame their disadvantages. The results of a simulation and an industrial application showed that the proposed method could get accurate results for the system with more than one gross error and was superior to iteration measurement test (IMT).
出处 《化工学报》 EI CAS CSCD 北大核心 2007年第11期2828-2833,共6页 CIESC Journal
基金 国家自然科学基金项目(20506003 20776042) 教育部科学技术研究重点项目(106073) 国家高技术研究发展计划项目(2007AA04Z164 2007AA04Z171)~~
关键词 数据协调 显著误差检测 节点检测 测量数据检测 data reconciliation gross error detection nodal test measurement test
  • 相关文献

参考文献12

  • 1Kong M F, Chen B Z, He X R, Hu S Y. Gross error identification for dynamic system. Computers and Chemical Engineering, 2004, 29 (1): 191-197.
  • 2Kuehn D R, Davidson H. Computer control (Ⅱ).. Mathematics of control. Chem. Engng. Prog. , 1961, 57 (6): 44-47.
  • 3Mah R S H, Tamhane A C. Detection of gross errors in process data. AIChEJ., 1982, 28 (5): 828-830.
  • 4Yang Youqi, Ten Rongbo, Jao Luiqun. A study of gross error detection and data reconciliation in process industries. Computers and Chemical Engineering, 1995, 19 (suppl. 1) : 217 222.
  • 5李津蓉,戴连奎.一种新的数据协调模型及显著误差检测[J].浙江大学学报(工学版),2003,37(6):693-697. 被引量:8
  • 6Serth R W, Heenan W A. Gross error detection and data reconciliation in steam-metering systems. AIChE J., 1986, 32 (5):733-741.
  • 7Cameron M C. Data reconciliation progress and challenges// Proceedings of the 5th International Symposium on PSE 94. Korea: Korean Institute of Chemical Engineers, 1994: 111-21.
  • 8Wang Fang, Jia Xiaoping, Zheng Shiqing, Yue Jincai. An improved MTNT method for gross error detection and data reconciliation. Computers and Chemical Engineering, 2004, 28 (11):2189-2192.
  • 9Yuan Yonggen(袁永根),Li Huasheng(李华生).Process System Data Rectification Technology(过程系统测量数据校正技术).Beijing:China Petrochemical Press,1996.
  • 10Yu Yin(于寅).Advanced Engineering Mathematics(高等工程数学).Wuhan:Huazhong University Science and Technology Press,1995.

二级参考文献2

共引文献7

同被引文献10

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部