摘要
爆破工程具有周期短、自成完整体系、技术管理严格的特点,但在费用管理上需进一步规范与整顿。本文阐述了工程费用的构成、调整及爆破工程费用的计算方法。
Blasting engineering is characterized by short period, whole system and stria technical administration. But it is necessary that further improvement and standard method in the fund administration should be taken. How to calculate blasting engineering charges is the main subject is discussed in this paper.
出处
《工程爆破》
1997年第1期64-67,共4页
Engineering Blasting
关键词
爆破工程
工程费用
计算
Blasting engineering Composition of blasting project charges Fund calculation of blasting project