期刊文献+

递进法在沙漠公路施工中的应用

Application of Step-by-step Method in Highway Construction in Desert
下载PDF
导出
摘要 沙漠公路由于地处沙漠,无现成道路可供施工使用,修筑便道成本费用高,且对环境破坏较大,一般采用递进法施工。传统的递进法施工对已成型工程影响较大,施工进度和质量受到较大限制,通过改进的递进法施工较好的解决了这个问题。以新疆阿拉尔至和田沙漠公路为例,简述了递进法施工的具体实施过程,提出了应用该方法施工应注意的问题。 Because of no existing road available, high cost for temporary road, and a huge damage to the Surroundings, when constructing highways in desert, step-by-step method was used usually. However, the traditional methods have an influence on unfinished project; construction plan and quality are limited as well. This entire problem was solved preferably by an improved step-by-step method. This article takes the desert road from Alaer to Hetian in Xinjiang as a sample to describe the details on this new method and gives some useful suggestions when using this method.
作者 陈中华
出处 《国外建材科技》 2007年第5期134-137,共4页 Science and Technology of Overseas Building Materials
关键词 沙漠公路 递进法 施工 highway in desert step-by-step method construction
  • 相关文献

参考文献9

  • 1王增学,靳秀萍.沙漠公路路基施工与质量控制[J].筑路机械与施工机械化,2001,18(3):38-39. 被引量:4
  • 2中国石油天然气总公司塔里木石油勘探开发指挥部.塔里木沙漠石油公路[M].北京:石油工业出版社,1996.p94,102,117,216,219.
  • 3新疆交通科学研究院.沙漠地区公路勘测设计及施工验收指南[J].乌鲁木齐市,2005.
  • 4毛强硕.风沙路基填筑施工[J].铁道建筑技术,2000(6):43-44. 被引量:5
  • 5陕西省公路局.沙漠地区筑路成套技术之沙漠地区公路路基施工及质量控制技术研究[J].西安:2005.
  • 6新疆交通科学研究院、新疆石油局勘察设计研究院.沙漠油田固沙材料室内研究报告[R],1993.
  • 7李江.沙漠明渠风积砂筑堤设计标准及碾压特性研究,2005.
  • 8李志勇,梁乃兴,梅迎军.风积沙路基压实度检测方法研究[J].重庆交通学院学报,2005,24(1):73-76. 被引量:15
  • 9新疆水利水电勘测设计研究院勘测总队.沙漠砂工程性质研究报告[R].乌鲁木齐市,2001.

二级参考文献2

  • 1姚祖康.公路设计手册-路面(第2版)[M].北京:人民交通出版社,1997..
  • 2沙庆林.公路压实与压实标准(第3版)[M].北京:人民交通出版社,1998..

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部