摘要
南京玄武湖隧道主体结构大体积混凝土施工的监测实施信息化管理,适时调整施工方案,从而确保了工程的施工质量。
During construction of Nanjing XuanWu Lake Tunnel, construction method of mass concrete is usually adjusted according to testing information, which insured high quality of this project.
出处
《江苏建筑》
2007年第5期27-29,共3页
Jiangsu Construction
关键词
隧道
大体积混凝土
温度监测
混凝土应变
内外温差
tunnel
mass concrete
temperature test
concrete strain
temperature difference between inside and out- side