数据仓库项目进度计划编制方法研究

Study on the Method of Data Warehouse Project Schedule Development
下载PDF
导出
摘要 在阐述数据仓库结构体系和数据仓库项目特殊性的基础上,把关键路径法(CPM)和计划评审技术(PERT)相结合,提出了编制数据仓库项目进度计划网络图的综合方法。这种综合方法有利于分析处理不确定因素,能有效地保障项目成功;最后,作者按照综合方法,用具体案例的数据做了计算。 This paper discusses how data warehouse can be systematically structured,in particular its application in a data warehouse project. By combining Critical Path Method (CPM)and Program Evaluation and Review Technique (PERT),a synthetic method can be developed to create a data warehouse project schedule. This method is able to analyze and deal with uncertain factors, and the application of the method will ensure the project can be completed more effectively. This paper includes an actual application of the synthetic method.
出处 《价值工程》 2007年第3期99-102,共4页 Value Engineering
关键词 项目管理 数据仓库 进度计划 project management data warehouse schedule development
  • 相关文献

参考文献5

  • 1Project Management Institute:A Guide to the Project Management Body of Knowledge Third Edition;2004.
  • 2[美]Sid Adelman & Larissa Terpeluk Moss著,薛宇译.《数据仓库项目管理》[M].清华大学出版社,2003.
  • 3[美]Deborah S.Kezsbom & Katherine A.Edward著,杨春,李志超译.《动态项目管理》[M].人民邮电出版社,2004.
  • 4张澜,康增培.《数据仓库白皮书-结构与应用篇》[J].《赛迪网》2004.
  • 5[美]Kathy Schwalbe/著,邓世忠/译.《IT项目管理》[M].机械工业出版社,2001.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部