做好机组分部试运工作,是整组启动质量的保证。关键在于调试、基建、生产单位的配合与试运方案的合理性。
Work well the machine set a cent department to try the luck work, is the whole assurance that the set starts quality.The key lie in adjust to try, the set up,produce unit of match with try rationality of carry the project.