摘要 针对水电工程地下洞室群的施工特性,采用循环网络仿真与网络计划分析技术,提出了基于实时仿真的地下洞室群施工进度预测与控制方法.该方法能够充分反映实际施工工艺、资源配置等施工条件的动态变化;根据当前施工现状,可以在施工任意时刻分析预测施工工序持续时间与工程后期施工进度;通过调整施工参数,制订更切实际的动态进度计划,达到施工进度实时控制的目的.实际应用结果表明,该方法可以对施工过程中不同的进度调整措施进行有效性评价,为选择合理的进度控制措施提供有力的决策支持,从而增强进度控制的主动性. According to the characteristics of underground structure group construction in hydraulic power project, a method for schedule forecasting and control based on real-time simulation was presented with cycle operation network simulation and network analysis techniques. The method could reflect the dynamic changes of construction operation procedure, resource allocation and so on, which could be used to forecast work duration and analyze schedule deviation by simulating the construction process according to current conditions at any time during the construction. By updating construction parameters, a feasible dynamic progress was drawn and the real-time schedule control could be realized. Moreover, the effectiveness of different schedule adjustment measurements could be evaluated with the method. A practical application shows that the method provides a powerful decision-making system for choosing rational schedule control measurements and builds up the subjective initiative of schedule control.
出处 《天津大学学报》 EI CAS CSCD 北大核心 2007年第6期721-725,共5页 Journal of Tianjin University(Science and Technology)
基金 国家自然科学基金委员会 二滩水电开发有限责任公司雅砻江水电开发联合研究基金资助项目(50539120) 国家杰出青年基金资助项目(50479048)
关键词 地下洞室群施工 实时仿真 进度预测 进度控制 循环网络 underground structure group construction real-time simulation schedule forecasting schedule control cycle operation network
  • 相关文献

参考文献8

  • 1杨学红,胡志根.基于Petri网隧洞施工过程的系统建模[J].水电能源科学,2001,19(4):33-36. 被引量:17
  • 2Haas C,Einstein H H.Updating the decision aids for tunneling[J].Journal of Construction Engineering and Management,ASCE,2002,128(1):40-48.
  • 3葛震明.进度控制中随机活动综合期望时间分析法[J].系统工程理论方法应用,1998,7(2):46-49. 被引量:2
  • 4秦旋.概率型活动网络的计算机模拟[J].华侨大学学报(自然科学版),1998,19(1):50-56. 被引量:3
  • 5Hegazy T,Petzold K.Genetic optimization for dynamic project control[J].Journal of Construction Engineering and Management,ASCE,2003,129(4):396-404.
  • 6Zhong Denghua,Zhang Weibo,Li Jingru,et al.Study on dynamic visual simulation system for complex construction processes[C] // Computer Science and Technology in New Century.Beijing:International Academic Publishers/World Publishing Corporation,2001:429-433.
  • 7El-Rayes K.Object-oriented model for repetitive construction scheduling[J].Journal of Construction Engineering and Management,ASCE,2001,127 (3):199-205.
  • 8Ling F Y Y.How project managers can better control the performance of design-build projects[J].International Journal of Project Management,2004,22:477 -488.