4STEYN H.An investigation into the fundamentals of critical chain project scheduling[J].International Journal of Project Management,2000,19 (6):363-369.
5NEWBOLD RC.Project management in the fast lane -applying the theory of constraints[M].Boca Raton:The St.Lucie Press,1998:61-87.
6ZINOVY D,RADOVILSKY.A quantitative approach to estimate the size of the time buffer in the theory of constraints[J].International Journal of Production Economics,1998,55 (2):113-119.
7MICHAELS JV.Technical Risk Management[M].Prentice hall PTR,1996:65-69.
1Goldratt E M, Cox J. The Goal E M1. 2nd ED.Aldershot :Gower, 1993.
2Goldratt E M. It's Not Luck[M]. Aldershot: Cower,1994.
3Goldratt E M. Critical Chain [M]. MA.. The North River Press, 1997.
4Rand G K. Critical chain: The theory of constraints applied to project management [J]. Int J of Project Management, 2000, 18(3): 173-177.
5Steyn H. An investigation into the fundamentals of critical chain project scheduling [J]. Int J of Project Management, 2000, 19(6). 363-369.
6Herroelen W, Leus R. On the merits and pitfalls of critical chain scheduling[J]. J of Operations Management, 2001, 19(5): 559-775.
7Wei C C, Liu P H, Tsai Y C. Resource-constrained project management using enhanced theory of constraint[J]. Int J of Project Management, 2002,20(7) : 561-567.
8Yeo K T, Ning J H. Integrating supply chain and critical chain concepts in engineer-procure-construct(EPC) projects [J]. Int J of Project Management,2002, 20(4): 253-262.
9Brucker P, Drexl A, Mohring R,et al. Resource-constrained project scheduling: Notation, classifi-cation,models, and methods[J]. European J of Operational Research, 1999, 112(1):3-41.
10ROPPONEN J, LYYTINEN H. Component of Software Development Risk: How to Address Them? A Project Manager Survey[ J]. IEEE Transactions on Software Engineering, 2000, 26(2).