基于关键链的建设项目进度风险管理 被引量:16

下载PDF
导出
摘要 本文讨论了基于关键链技术的建设项目风险管理方法。引入理想完工时间估计工序的执行时间,考虑单一资源冲突约束,建立项目的关键链。通过对各道工序的风险分析,依据风险量大小设置项目缓冲和输入缓冲,通过对缓冲区的监控进行风险管理。
机构地区 河海大学商学院
出处 《科技管理研究》 CSSCI 北大核心 2007年第10期138-139,143,共3页 Science and Technology Management Research
基金 河南省社会科学界联合会调研课题(2004SKL1004)
  • 相关文献

参考文献9

  • 1NIGEL J.Smith.Managing Risk in construction Projects[M].U.K:Black well Science,1999:21 -35.
  • 2GOLDRATTEM.Critical Chain[M].Great Barrington,MA:North River Press,1997:13 -50.
  • 3王雪青,郭留洋,符桃.基于关键链技术的工程项目进度规划问题研究[J].河北工业大学学报,2005,34(6):20-23. 被引量:26
  • 4STEYN H.An investigation into the fundamentals of critical chain project scheduling[J].International Journal of Project Management,2000,19 (6):363-369.
  • 5NEWBOLD RC.Project management in the fast lane -applying the theory of constraints[M].Boca Raton:The St.Lucie Press,1998:61-87.
  • 6ZINOVY D,RADOVILSKY.A quantitative approach to estimate the size of the time buffer in the theory of constraints[J].International Journal of Production Economics,1998,55 (2):113-119.
  • 7MICHAELS JV.Technical Risk Management[M].Prentice hall PTR,1996:65-69.
  • 8蒋国萍,陈英武.基于关键链的软件项目进度风险管理[J].计算机应用,2005,25(1):56-57. 被引量:19
  • 9刘士新,宋健海,唐加福.关键链——一种项目计划与调度新方法[J].控制与决策,2003,18(5):513-516. 被引量:56

二级参考文献26

  • 1Goldratt E M, Cox J. The Goal E M1. 2nd ED.Aldershot :Gower, 1993.
  • 2Goldratt E M. It's Not Luck[M]. Aldershot: Cower,1994.
  • 3Goldratt E M. Critical Chain [M]. MA.. The North River Press, 1997.
  • 4Rand G K. Critical chain: The theory of constraints applied to project management [J]. Int J of Project Management, 2000, 18(3): 173-177.
  • 5Steyn H. An investigation into the fundamentals of critical chain project scheduling [J]. Int J of Project Management, 2000, 19(6). 363-369.
  • 6Herroelen W, Leus R. On the merits and pitfalls of critical chain scheduling[J]. J of Operations Management, 2001, 19(5): 559-775.
  • 7Wei C C, Liu P H, Tsai Y C. Resource-constrained project management using enhanced theory of constraint[J]. Int J of Project Management, 2002,20(7) : 561-567.
  • 8Yeo K T, Ning J H. Integrating supply chain and critical chain concepts in engineer-procure-construct(EPC) projects [J]. Int J of Project Management,2002, 20(4): 253-262.
  • 9Brucker P, Drexl A, Mohring R,et al. Resource-constrained project scheduling: Notation, classifi-cation,models, and methods[J]. European J of Operational Research, 1999, 112(1):3-41.
  • 10ROPPONEN J, LYYTINEN H. Component of Software Development Risk: How to Address Them? A Project Manager Survey[ J]. IEEE Transactions on Software Engineering, 2000, 26(2).

共引文献90

同被引文献96

引证文献16

二级引证文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部