期刊文献+

维修性验证试验中样本问题 被引量:3

Sample Problem in Maintainability Demonstration Test
下载PDF
导出
摘要 维修性验证分析,只选取试验样本与样本选取集的交集部分,其缺少部分需要用模拟维修作业样本集补充。基于分层随机抽样的维修性试验样本的选取,以各系统组成单元的主要技术特征作为依据进行第1次分层,进行第2次分层前需首先进行维修作业分析。第3次分层则以维修作业发生频率、维修耗时预计和产品数量为分层的主要考虑因素,分组过程与GJB-2072基本一致。 The maintainability demonstration analysis only selects intersection of testing sampling and sampling selection unit. Its missing department needs complementarily of simulation task sampling. Sample-selecting method based on stratified random sampling is presented, the first time to stratify is according as the technology characteristics of the buildup-cells, the second time to stratify is based on maintenance task analysis, the third time layer to stratify is along with GJB-2072 and based on maintenance happening frequency, maintenance time predict and product quantity.
出处 《兵工自动化》 2007年第10期75-76,共2页 Ordnance Industry Automation
关键词 维修性验证 样本选取 样本产生 分层随机抽样 Maintainability demonstration Sample selecting Sample producing Stratified random sampling
  • 相关文献

参考文献2

  • 1David J Smith. Maintainability Engineering [M]. New York: Pitman Publishing, 1973.80-81.
  • 2GJB2072-94.维修性试验与评定[S].[S].,1994..

共引文献12

同被引文献20

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部