期刊文献+

南芬铁矿冯家东沟排土场泥石流防治探讨

DISCUSSION ON PREVENTION AND CONTROL OF DEBRIS FLOW AT FENGJIADONGGOU DUMPING GROUND IN NANFEN IRON MINE,LIAONING PROVINCE
下载PDF
导出
摘要 分析了辽宁南芬铁矿冯家东沟排土场泥石流形成原因、造成危害,运用模糊数学原理,进行南芬铁矿冯家东沟排土场泥石流危险度评估,进而探讨泥石流预防治理体系,浅析减轻泥石流灾害与可持续发展的关系。 The article analyzes the cause and harm of the debris flow disaster occurred at the Fengjiadonggou dumping ground in Nanfen Iron Mine, Liaoning Province. The danger degree of debris flow is assessed by way of fuzzy mathematic principle. The prevention and control system for debris flow in the area is discussed. The interrelation between reduction of debris flow disaster and sustainable development is also expounded.
出处 《地质与资源》 CAS 2007年第3期215-217,212,共4页 Geology and Resources
关键词 排土场 泥石流 评估 防治 辽宁南芬铁矿 dumping ground debris flow assessment prevention and control Nanfen iron mine in Liaoning Province
  • 相关文献

参考文献3

  • 1《工程地质手册》编写委员会.工程地质手册(第三版)[M].北京:中国建筑工业出版社,1992..
  • 2朱训,张业成,高庆华,等.减轻地质灾害与可持续发展[M].北京:中国科学技术出版社,1999.80-96.
  • 3辽宁省地质环境监测总站.南芬铁矿2#排土场稳定性分析及治理研究.2005.

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部