摘要
白山水电站枢纽工程分一、二、三期,一期枢纽由三心圆重力拱坝及右岸发电系统组成,总容量900MW;二期工程为左岸发电系统,总容量600MW;三期为抽水蓄能电站,总容量300MW。一期、二期已建成运行多年,三期工程已完工投入运行。
The Baishan water power station is composed by the first stage,the second stage and the three stage projects.The first stage complex is composed by gravity-arch dam with three circle centres and power generation system in right bank with installed capacity of 900 MW.The second stage project is situated in left bank,the installed capacity is 600 MW.The three stage project is the pumped storage power station with installated capacity of 300 MW.The first stage and the second stage projects put into operation in many years.The three stage project is accomplished and put into operation.
出处
《东北水利水电》
2007年第11期6-7,共2页
Water Resources & Hydropower of Northeast China
关键词
白山水电站
二期三期工程
布置设计
Baishan water power station
second and three stages projects
layout design