摘要
对邯钢2000m3高炉煤气余压发电TRT机组2005年8月份发电量突然降低原因进行了分析,制定了解决方案,之后发电量明显提高,高炉和TRT机组运行安全稳定。
The reason is analyzed for sudden reduction of output of TRT electricity generating set in August of 2005. The solving plan was worked out and carried out. As a result the output got obvious raised.
出处
《河北冶金》
2007年第3期50-52,共3页
Hebei Metallurgy
关键词
高炉
煤气
TRT
发电量
blast furnace
gas
TRT
output of electricity