摘要
在送电线路施工过程中,铁塔基础经常采用灌注群桩的基础形式,500kV崖门大跨越工程两基跨江高塔基由于荷载大及地质条件较差的缘故均采用了灌注群桩基础,基于该工程的施工实际,对灌注桩群桩基础的质量管理、控及预防进行介绍。
In transmission line construction process, base form of primed pile group used to adopt as the steel tower base. In 500kV Yamen river-crossing project, due to the load is heavy and geologic condition is soft, all are adopted primed pile group bases. Based on this project construction practice, this paper introduces the management control and prevention of construction quality for base of primed pile group.
出处
《广东输电与变电技术》
2007年第6期55-57,共3页
Guangdong Power Transmission Technology
关键词
灌注群桩
施工质量
管理控制与预防
Primed pile group
Construction quality
Management control and prevention