摘要
对2005年安钢6号高炉发生的一起炉料偏行的处理思路与措施进行了总结分析,指出在尽量确保炉况顺行的前提下,做到"早动、少动、争取主动",充分运用上中下部调剂,特别是灵活压料、布料,合理控制煤气流分布,使这次炉料偏行的处理收效很好.
A summary is made in the discussion of handling an accident burden material falling deviation occurring in 2005 at Ansteel 6th BF. It is pointed out that a rule of "Rectifying (the deviation) early and initiatively, if necessary, while keeping the furnace operating as smoothly as possible" must be followed in handling the deviation. The deviation was properly rectified by promptly regulating the operating parameters and the burden material distribution of the furnace, and by properly controlling the furnace gas distribution.