摘要
分析了生铁成本高的原因,针对薄弱环节,采取精料,维护炉况顺行,对标挖潜等相应措施,达到了降低成本的目的.
The causes of the high cost of pig iron produced at Ansteel 8th BF were analyzed, and problems associated with the furnace performance pointed out in the article. By adopting such precautions as utilizing concentrate materials, keeping a smooth operation of the BF, and exploiting the potential capacity of the furnace, the production cost of the pig iron was appreciably cut down.
出处
《南方金属》
CAS
2007年第6期52-53,共2页
Southern Metals
关键词
成本
节能
对策
cost
energy saving
precaution