超高面板坝的关键技术问题 被引量:42

Key Technical Issues Related to Super-high Concrete Slab Dam
下载PDF
导出
摘要 总结了100m级面板坝的技术要点,分析了200m级超高面板坝建设出现的主要问题和原因,在2000年以后修建的超高面板坝主要经验的基础上,提出了300m级面板坝需要研究的关键技术问题。 This essay summarizes the main technical points related to 100-meter-high concrete slab dam and analyzes the main problems and their causes of 200-meter-high concrete slab dam during construction period. Based on the main experiences of the super-high concrete slab dam built after the year of 2000, key technical issues related to 300-meter-high concrete slab dam that need research have been raised in this article.
出处 《中国工程科学》 2007年第11期4-10,共7页 Strategic Study of CAE
关键词 混凝土面板堆石坝 超高坝 关键技术 concrete slab dam super-high dam technology
  • 相关文献

参考文献5

  • 1Marulanda A,Pinto N L S.Recent experience on design,construction,and Performance of CFRD dams[A].J Barry Cooke.Concrete Face Rockfill Dams[M].Beijing,2000
  • 2Cooke J B.Development in high concrete face rockfill dams,Hydropower & Dams[M].Issue Four,Volume Four,1997.
  • 3曹克明.技术总结:面板堆石坝设计[R].杭州:华东勘测设计研究院,2006..
  • 4谭靖夷.我国坝工技术的发展[J].水力发电,2004,30(12):60-63. 被引量:11
  • 5杨泽艳,周建平.我国特高面板堆石坝的建设与技术展望[J].水力发电,2007,33(1):64-68. 被引量:32

二级参考文献2

共引文献37

同被引文献373

引证文献42

二级引证文献383

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部