摘要
从主观和客观两方面分析了宝鸡峡灌区骨干渠系淤积成因,并提出要采取工程措施和非工程措施并举,从源头上控制泥沙入渠,从措施上减少泥沙入渠,以恢复渠道输水能力,保障灌区农田适时灌溉。
The causation of the siltation of the key canal system in Baojixia Irrigation District is subjectively and objectively analyzed herein, and then the relevant engineering and non-engineering countermeasures are put forward, such as controlling the sediment from the source and reducing the inflow of sediment into canal system with relevant measures, so as to restore the water conveyance capacity of the canal system and ensure the well-timed irrigation of the district.
出处
《水利水电技术》
CSCD
北大核心
2007年第11期84-86,共3页
Water Resources and Hydropower Engineering
关键词
渠系淤积
成因分析
干渠
措施
宝鸡峡灌区
siltation of canal system
causation analysis
main canal
measures
Baojixia Irrigation District