摘要
新兴铸管第二炼铁部近三年来,通过技术创新、优化原料结构、严格工艺纪律、强化生产等手段,推行烧结生产新技术、新工艺,在降耗增效方面取得了长足的进步。
In recent three years, through modifying equipment, optimizing proportioning of raw materials and intensifying production management in No2 Ironmaking Works, XINXING PIPES GROUP, the quality and quantity of sinter were increased, the technical-economical indices were improved and the satisfactory benefit was obtained.
出处
《烧结球团》
北大核心
2007年第5期51-55,共5页
Sintering and Pelletizing
关键词
烧结生产
设备改造
生产管理
降耗
效益
sintering production, equipment modification, production management, decreasing consumptions, benefit