摘要
本文着重论述应用沉井技术,解决位于回填沙包土的旧河道的深基施工中遇到的受潮汐影响,补给丰富的地下水的难题,做到一物多用.经济效益十分显著。
In this paper, discuss that apply open cassion technique to solve difficult problem of filling rich gnundwater by tide'saffection in deep foundation pit constrution, being situated in former river course of backfilled sandy soul, acheive remarkable economic benefis.
出处
《福建建筑》
1997年第2期41-42,共2页
Fujian Architecture & Construction
关键词
深基坑
沉井
降水
截水
排水
deep foundation pit
open cassion
precipitation
drain off water
out off water