摘要 新安江大坝已运行40多年,本文通过对水毁情况、历年泄洪情况的分析,并在冲刷坑理论计算和冲坑系数反推分析的基础上,得出冲坑系数在0.62~1.113之间,即使选用较大的可能冲刷深度,大坝、厂房、开关站等主要建筑物的稳定也能得到保证的结论。同时,提出了减轻泄洪对下游冲刷区影响的工程措施。 Xin'anjiang dam has been in operation for more than 40 years. The article elicited that the coefficient of scour hole was between 0.62 and 1.113, even if larger possible scour depth, the stability of main buildings, such as dam, powerhouse and switchyard, can be ensured. Further more, the paper put forward some engineering measures to alleviate flood discharge influence to scour area.
作者 王淡善
出处 《大坝与安全》 2007年第5期48-53,共6页 Dam & Safety
关键词 厂房顶溢流 尾水渠 冲刷 分析 新安江水电站 overflow type tailwater channel scour analysis Xin'an jiang hydropower station
  • 相关文献

参考文献3

  • 1水工设计手册6[S].水利电力出版社,1987.
  • 2泄水建筑物消能防冲论文集[C].水利出版社,1980,11.
  • 3郭子中.消能防冲原理与水力设计[M].1982.

同被引文献10

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部