白云江水库拱坝周边缝失效前、后坝体应力对比分析

Comparison of dambody stress before and after invalidation of peripheral joint of Baiyunjiang dam
下载PDF
导出
摘要 通过采用Abqus大型有限元计算软件对该水库拱坝应力状态进行的计算,结果表明:周边缝在锚固与灌浆后失效,失效后周边缝附近应力集中现象显著增强,且在高水位条件下,周边缝附近上游坝面拉应力均超过允许拉应力。 According to the calculation result of stress condition for Baiyunjiang reservoir arch dam with Abqus software (a large finite element calculating software), the conclusion was got as follows: the peripheral joint invalidated after anchorage and grouting, then the stress concentration around it increased significantly. In the condition of high water level, the tensile stress of upstream dam face around peripheral joint exceeded the allowable tensile stress.
出处 《大坝与安全》 2007年第5期57-60,共4页 Dam & Safety
关键词 白云江水库 周边缝 底缝 有限元分析 应力集中 Baiyunjiang reservoir peripheral joint base joint finite element analysis stress concentration
  • 相关文献

参考文献2

  • 1SL282-2003.混凝土拱坝设计规范[S].[S].,..
  • 2SL/T191-96.水工混凝土结构设计规范[S].[S].,..

共引文献178

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部