摘要
主要介绍万家寨引黄工程(一期工程)运用大型薄壁梯形堰测流的基本情况,包括薄壁堰的设置及5年来的运行效果。
This paper introduces the basic situation of using large trapezoidal thin-wall weir to stage project of Wanjiazhai YRDP, including the installation of the thin-wall weir and the 5 years' thin-wall weir after its installation measure flow in the first operating results of the
出处
《科技情报开发与经济》
2007年第29期270-271,共2页
Sci-Tech Information Development & Economy