摘要
主要从现场勘察、负荷计算、漏电保护系统的设置、配电线路、防雷接地和管理资料等方面阐述了大型施工现场在临电施组时应考虑的问题。
This paper probes into some problems needing attention in the construction organization of large field temporary power from the aspects of site investigation, load calculation, setup of leakage protection system, distribution line,grounding for lightening and management documents.
出处
《科技情报开发与经济》
2007年第29期278-279,共2页
Sci-Tech Information Development & Economy
关键词
大型施工现场
临时用电
施工组织设计
large construction field
temporary power
construction organization design