阐述了组合结构的特点,介绍了太原第一热电厂Ⅴ期工程概况,分析了钢管混凝土柱的工作原理及特点,重点探讨钢管混凝土柱的设计。
This paper expounds the features of the composite structure, introduces the general situation of the 5th phase of construction of Taiyuan No. I Thermal Power Plant, analyzes the working principles and characteristics of the concretefilled steel tube columns, and probes emphatically into the design of the concrete-filled steel tube columns.
出处
《科技情报开发与经济》
2007年第28期175-176,共2页
Sci-Tech Information Development & Economy
关键词
钢管混凝土柱
组合结构
输煤栈桥
concrete-filled steel tube columns
composite column
coal trestle