摘要
对预应力混凝土T梁连续梁桥的施工工艺进行了分析,其对T梁的预制、张拉、存在问题及解决措施,临时支座的选定及体系转换进行了探讨。
This paper analyzes the constructing technique of prestressing concrete continual T-beam bridge precisely and discusses the prefabrication, tense, problems and solution of T-beams, selection of temporary stand as well as its system transformation.
出处
《科学之友》
2007年第11B期26-27,共2页
Friend of Science Amateurs
关键词
预制
张拉
临时支座
体系转换
prefabrication
tense
temporary stand
system transformation