改进蚁群算法在海洋工程群项目资源调度中的应用 被引量:1

Application of Improved ACO in Resource Scheduling of Offshore Project Groups
下载PDF
导出
摘要 当今海洋工程群项目管理中的瓶颈之一是人力、资金、设备及材料等资源的合理、动态调度问题。针对此问题,引入了基于信息熵的改进蚁群算法。该方法将资源需在各个分项目中占用的时间与资源的急需程度与之比作为算法中的启发式信息进行处理。与传统调度方法的比较及海洋工程群项目资源动态调度工程实例表明,该方法可实现资源的合理、动态调度,为海洋工程及其他工程领域群项目管理提供了一较为有效的资源调度算法。 Dynamic resources scheduling in group management is an urgent question in offshore engineering management. To solve this question, an improved Ant Colony Optimization algorithm based on information entropy was introduced. The core is that the proportion of the time needed in every project with the degree of demand of the resources is viewed as the meta-information. Performance comparison and engineering practice in solving the resources scheduling in offshore engineering show that using the algorithm, the resources can be allocated dynamically and rationally with high efficiency. The method can be used in the dynamic resources scheduling problems of other fields.
作者 李彦苍
出处 《中国管理科学》 CSSCI 2007年第5期83-87,共5页 Chinese Journal of Management Science
基金 国家自然科学基金资助项目(505779047) 教育部博士点基金资助项目(200300560045)
关键词 群项目管理 资源调度 海洋工程 蚁群算法 旅行商问题 management of project groups resources scheduling offshore engineering adaptive ant colony optimization
  • 相关文献

参考文献16

  • 1Gert Wijnen,Rudy Kor 著,戚安邦等译独特性任务的项目与项目群管理方法[M].天津:南开大学出版社,2005.
  • 2Chua,T.J.,Wang,F.Y.,Cai,T.X.et al.A heuristics-based advanced planning and scheduling system with bottleneck scheduling algorithm[C].2006 IEEE Conference on Emerging Technologies and Factory Automation,2007.
  • 3肖博文.应用禁忌搜寻法求解营建工程专案多重资源排程最优化之研究[D].朝阳科技大学,2002.
  • 4Faniran O.O.,Love P.E.D,Li H..Optimal allocation of construction planning resources[J],Journal of Construction Engineering and Management,1999,125 (5):311-319.
  • 5Zhou Jiayi,YU Kunming,Chou Chih et al.A dynamic resource broker and fuzzy logic based scheduling algorithm in grid environment[C].Adaptive and Natural Computing Algorithms.8th International Conference,2007,604-616.
  • 6Figielska E..Combining an optimizing method with a genetic algorithm to solve a flowshop scheduling problem with additional resources[C].2006 IEEE Conference on Emerging Technologies and Factory Automation,2007.
  • 7Shadrokh Shahram,Kianfar,Fereydoon.A genetic algorithm for resource investment project scheduling problem,tardiness permitted with penalty[J].European Journal of Operational Research,2007,181 (1):86-101.
  • 8Liu Shu-Shun,Wang Chang-Jung.Optimization model for resource assignment problems of linear construction projects[J].Automation in Construction,2007,16(4):460-473.
  • 9Leu,S.S.,Chen,A.T.,Yang,C.H..Fuzzy optimal model for resource-constrained construction scheduling[J].Journal of Computable Civil Engineering,1999,13(3):207-216.
  • 10Dorigo M.,Maniezzo V.,Colorni A..The Ant System:An autocatalytic optimizing process[R].Technical Report 91-106 revised,Department of Electronic,Politecnico of Milano,Milan,Italy,1991.

二级参考文献12

共引文献79

同被引文献12

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部