摘要
The construction of the PTA project owned by the Yisheng Dahua Petrochemical Co., Ltd. was kicked off in November 2006, and this unit is scheduled for startup in the second half of 2008. The capacity of the first phase PTA unit will be 500 kt/a, and will finally reach 1.2 Mt/a. The Yisheng Dahua Petrochemical Company is a newly established China-foreign joint venture, which has ordered two compressor trains for its PTA production facilities from the Siemens PG.