摘要
水电站首台机组投产后.后续机组的安装工作会影响已投运机组的正常运行。小浪底电厂运行人员采取一些技术和组织措施,确保了投产机组的安全稳定运行。
The installation of sueeedent generation units may affect the operation of existed units. Some teehnical and constitutional measures were taken during installation period, which ensures that the existed generation units operated normally.
作者
李鹏
孔卫起
丁焱
LI Peng, KONG Wei-qi, DING Yan(Electric Power Plant of Administration Bureau of Xiaolangdi Key Hydraulic Project, Jiyuan 454681, Henan Province, China)
关键词
小浪底
机组安装
运行管理
Xiaolangdi
generator installation
operation management