超高吨位灌注桩静载试验中的预应力混凝土反力装置 被引量:3

Prestressed concrete reaction system for ultrahigh static loading tests of bored piles
下载PDF
导出
摘要 在复兴大桥超高吨位灌注桩的静载试验,预应力混凝土反力装置替代了传统的钢梁反力系统。这套装置主要包括预应力锚桩、预应力承台与预应力反力梁。试验结果表明,直接获得超高吨位大直径嵌岩桩的极限承载力相当不易,而对这类问题预应力混凝土反力装置是值得考虑的。 The traditional steel beam reaction system was substituted by prestressed concrete reaction system in the ultrahigh static loading tests of bored piles of Fuxing Bridge. It was shown that it was still difficult to directly obtain the ultimate bearing capacity of a large-diameter rock-socketed pile, and the prestressed concrete reaction system was helpful to the solution of this kind of problems.
作者 许进军
出处 《岩土工程学报》 EI CAS CSCD 北大核心 2007年第11期1726-1729,共4页 Chinese Journal of Geotechnical Engineering
关键词 灌注桩 超高吨位静载试验 预应力混凝土 桩侧摩阻力 桩底反力 bored pile ultrahigh static loading test prestressed concrete friction end bearing
  • 相关文献

参考文献2

  • 1史佩栋,陆怡.Osterberg静载荷试桩法10年的发展[J].工业建筑,1999,29(12):17-18. 被引量:25
  • 2WEERASINGHE R B, ADAMS D. A technical review of rock anchorage practice 1976-1996[C]. Proceeding of International Conference on Ground Anchorages and Anchored Structure, London, 1997:443 - 446.

共引文献24

同被引文献9

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部