北墅水库输水暗渠破坏原因分析及加固处理措施 被引量:1

Destructive Cause and Consolidation Treatment of Underground Conveyance Canal in Beishu Reservoir
下载PDF
导出
摘要 由于工程老化,年久失修,北墅水库输水暗渠墙体多处发生位移破坏,严重影响工程的正常使用。通过对输水暗渠墙体破坏区受力状态的初步分析,找出了输水暗渠破坏原因,得出了破坏区墙体与拱座是分离的、直墙顶不承受拱荷载作用、在墙背回填料和较高外水压力作用墙体不满足抗倾安全要求而破坏的结论,提出了衬砌加固处理措施。 In Beishu Reservoir, the displacement destruction appears at the underground conveyance canal because of ageing without repair. It influences the normal operation of the reservoir. Through the preliminary analysis of stressing conditions in the destroyed wall, the destructive cause is discovered along the underground conveyance canal. The wall in the destructive area is separated from the arch abutment and the vertical wall top doesn't bear the loading from the arch. The wall body cannot meet the demand of safety against overturning under the action of backfill and higher external water pressure. In the paper, the authors have put forward the measures of consolidation treatment in liner.
出处 《中国农村水利水电》 北大核心 2007年第11期107-108,共2页 China Rural Water and Hydropower
关键词 输水暗渠 破坏原因 加固处理 underground conveyance canal destructive cause consolidation treatment
  • 相关文献

参考文献3

二级参考文献6

  • 1SL279-2002.水工隧洞设计规范[S].[S].,..
  • 2张有天 张武功.隧洞水荷载的静力计算[J].水利学报,1980,(3):52-62.
  • 3A J Schleiss.Design of Pervious Pressure Tunnel[J].Water Power & Dam construction,1986,(5).
  • 4曹克明 刘世明.高内水压力作用下隧洞钢筋混凝土衬砌设计理论的探讨[J].华东水电技术,1991,(3):1-13.
  • 5张有天 张武功 王语.再论隧洞水荷载的静力计算.水利学报,1985,(3).
  • 6李青麒,何其诚.压力隧洞衬砌计算方法[J].水力发电学报,1998,17(3):24-33. 被引量:19

共引文献6

同被引文献20

引证文献1

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部