摘要
橄榄坝水电站位于云南省景洪市下游,其工程建设的主要任务是对上游景洪水电站的日调节不稳定流进行反调节以满足澜沦江下游河段航运要求并兼顾发电、生态用水等。本文简要介绍了该工程上、下两个坝址和其相应的Ⅰ、Ⅱ两个坝线的选择过程。
Ganlanba Hydropower Station is located in the backward position of Jinghong City, Yunnan Province. Primary task of it is adjusting daily unstable flux produced by the upstream Jinghong Concrete Gravity Dam. On the other hand, it will satisfy downstream navigation of Lancang River, generate electricity and fulfill environmental water use of local city, etc. The paper briefly introduces the process of choosing for two dam sites and their corresponding two dam lines.
关键词
橄榄坝水电站
坝址
坝线
Ganlanba Hydropower Station
Dam site
Dam line