糯扎渡水电站施工导流方案研究 被引量:1

Diversion scheme study to the Nouzhadou Hydropower Station
原文传递
导出
摘要 文章简要介绍了糯扎渡水电站施工导流方案研究思路,特别是导流布置方案,结合工程施工期导流,以及后期水库蓄水和向下游游供水方案进行综合考虑。一方面,为本工程导流设计提供了较为明晰的设计思路,保证了工程施工的顺利实施;另一方面,也对其他高坝大库的当地材料坝施工导流方案设计及研究工作有一定的参考价值。 The article introduces a method for research of water diversion scheme, especially diversion structures arrangement scheme which should be considered roundly in conjunction with river diversion, reservoir impoundment and water supply to downstream channel. On the one hand, there is a clear thoughts provided, which makes river diversion of the project implemented successfully, on the other hand, there is a referential value to river diversion scheme selection of other enormous projects whose dam is made of local materials.
出处 《云南水电技术》 2007年第3期74-78,共5页
关键词 糯扎渡水电站 导流标准 导流方式 导流隧洞 方案选择 Nouzhadou Hydropower Station Diversion standard Diversion mode Diversion tunnel Scheme selection
  • 相关文献

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部