期刊文献+

乌江洪家渡水电站厂坝基坑岩溶涌水与处理

Treatment of karst water gushing in foundation pitof Hongjiadu hydropower station on Wujiang PAver
原文传递
导出
摘要 在岩溶区兴建水力发电工程,基坑岩溶涌水是主要工程地质问题之一。乌江洪家渡水电站为在岩溶区兴建的大型水力发电工程,基坑内发育有K40、K80—1等岩溶管道系统,基坑岩溶涌水问题突出,现工程已完建,基坑岩溶涌水问题得到了成功处理。本文就乌江洪家渡水电站基坑岩溶涌水预测及工程处理进行总结、介绍。 Water gushing of foundation pit is one of the main engineering geologic problems for the hydropower projects built in karst area. Hongjiadu hydropower project is a large - scale hydropower project built in karst area. The problem of K40 and K80 - 1 path system in the foundation pit and water gushing is evident. At present, the project has been completed and the karst water gushing problem in foundation pit has been treated successfully. The paper concludes and introduces the forecast and engineenng treatment of karst water gushing in foundation pit of Hongjiadu hydropower station.
作者 肖万春
出处 《水电勘测设计》 2007年第4期1-4,共4页
关键词 乌江洪家渡水电站 基坑岩溶涌水 工程地质问题 工程处理 Hongjiadu hydropower station on Wujiang River gushing water of foundation pit engineering geologic problem engineering treatment
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部