3Dirk C Matffeld,Christian Bierwirth.An efficient genetic algorithm for job shop scheduling with tardiness objectives[J].European Journal of Operational Research, 2004;155:616-630.
4S Esquivel,S Ferrero et al.Enhanced evolutionary algorithms for single and multi-objective optimization in the job scheduling problem[J].Knowledge-Based Systems ,2003;15:13-25.
5L Sousen,H Shaoting.GA-basod resource-constrained flow-shop scheduling model for mixed precast production[J].Automation in Construction,2002;11:439-452.
6Byung J,Hyung R,Hyun S.A hybrid genetic algorithm for the job shop scheduling problems[J].Computers & Industrial Engineering,2003;45:597-613.