结合苍梧三期——河滨花园高层住宅基坑工程的具体情况,提出了控制施工环境影响的具体措施,阐述了基坑的降、排水方案,详细地介绍了基坑的土方开挖过程,以供类似工程借鉴。
Combined with concrete situations of high-rise residential foundation pit engineering of Hebin garden, the third phase of Cangwu project, the author proposes concrete measures to control environmental impact of construction, illustrates the dewatering and drainage scheme of the foundation pit, and introduces the earthwork excavation process of the foundation pit, in order to offer a reference for similar engineering.